Recently, at the 2025 Golden Bull Corporate Sustainable Development Forum themed “Good Governance for Long-Term Progress, Green Momentum for the Future”, Valiant, a subsidiary of CECEP, was awarded the third CRHC Cup · ESG Golden Bull Award.
From December 4 to 5, Cao Huabin, Deputy General Manager of CECEP, attended the Fourth Session of the Eighth Council of the China International Contractors Association (CHINCA) and the Association’s 2025 Annual Industry Conference in Zhengzhou, Henan Province. 
Recently, CECEPEC, a subsidiary of CECEPHK, was certified for the fifth consecutive year by the Hong Kong Monetary Authority (HKMA) as an approved external reviewer under the Green and Sustainable Finance Grant Scheme.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
第  15  /  33  页  总条数: 163
Produced By CMS 网站群内容管理系统 publishdate:2026-03-30 16:14:54