Date:2022-03-22
Since February 3, China Energy Conservation and Environmental Protection Group (CECEP) has taken measures to assign specific preliminary tasks on work and production resumption and guide its subsidiaries specializing in medical waste treatment, solid waste treatment, water supply, clean energy and equipment manufacturing to resume operations and stabilize production in an orderly manner, while strictly
Date:2022-03-22
On March 31, 2020, as the on-spot commander blew the whistle, a gigantic crane roared and lifted building materials up at the construction site of the Nanling 100MW power booster station of CECEP Wind Power (Wufeng) Co., Ltd. This marked that the company, located in Hubei Province, the hardest-hit region in China during the COVID-19 epidemic, resumed full operation.
Date:2022-03-22
On the morning of March 23, 2020, Song Xin, secretary of the Party Committee and chairman of China Energy Conservation and Environmental Protection Group (CECEP), visited CECEP subsidiaries Hi-Tech Optoelectronics Co., Ltd. and Xiaotangshan Recycled Water Plant, which takes
Date:2022-03-22
The No.4 Metallurgical Construction Company of China Limited, a subsidiary of CECEP, actively implements requirements of the government and the group company on epidemic prevention and control and the resumption of production and operation, continuously strengthens project management, and promote both epidemic control and production resumption in a holistic way.