On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
Recently, Wind, a leading domestic ESG (Environmental, Social and Governance) rating agency, released its 2025 results, recognizing CECEP Guozhen’s outstanding ESG performance with an upgraded AA rating — a historic leap of two levels.
On September 26, CECEP won five major awards at the national finals of the 2025 China Lean Digital Innovation Competition, organized by the China Enterprise Reform and Development Society.
On the morning of September 20, the opening ceremony of the 2025 World Manufacturing Convention was held in Hefei, Anhui. Wang Yong, Vice Chairman of the CPPCC National Committee, delivered remarks and declared the conference open.