On April 21, the post-disaster well-drilling project in Zimbabwe, undertaken by CGC, a subsidiary of CECEP, was awarded an Excellent rating for project management and a High Quality rating for engineering quality by the Ministry of Commerce.
Recently, the Zhangye Pingshanhu 100MW wind-plus-storage integrated project of CECWPC Northwest Regional Company achieved full-capacity grid connection.
On April 17, Liao Jiasheng, Chairman of CECEP, visited the headquarters of Jianlong Group and held a working meeting with Zhang Zhixiang, Chairman and President of Jianlong Group.
On March 15, the project team of CQEC’s Chittagong Medical College project in Bangladesh, together with the affiliated hospital of the college, organized a free medical consultation event themed “Caring for the Frontline, Safeguarding Health”, delivering professional medical services and health support to frontline construction workers.
On March 13, CCTV-13 News 30’ reported that the 110-ton-class Liqing-2 pintle liquid oxygen–kerosene engine, independently developed by CAS Space, successfully completed a long-duration test run.
Recently, the Energy Bureau of the Inner Mongolia Autonomous Region released the first batch list of independent new-type energy storage construction projects for 2026.
Recently, Valiant Pharmaceutical’s first active pharmaceutical ingredient (API), olmesartan medoxomil, successfully passed the rigorous review of the European Directorate for the Quality of Medicines and HealthCare (EDQM) and obtained the Certificate of Suitability to the European Pharmacopoeia (CEP), supported by its advanced and independently developed research and production process.
On March 12, Liao Jiasheng, Chairman of CECEP, met with Zeng Yuqun, Chairman and CEO of CATL, and his delegation at CECEP headquarters.
第  9  /  41  页  总条数: 202
Produced By CMS 网站群内容管理系统 publishdate:2026-06-12 14:00:52