On October 22, Liao Jiasheng, Chairman of the Group, held a working meeting with Liu Qiong, Director of the National Energy Conservation Center, at the Group’s headquarters.
On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
On September 17, during the 22nd China–ASEAN Expo, Liao Jiasheng, Chairman of the Group, held talks with Tea Kong, Vice Minister of Interior of the Kingdom of Cambodia, in Nanning, Guangxi.
Recently, the 2025 Enterprise New Quality Productive Forces Development Conference, hosted by the China Enterprise Reform and Development Society, concluded in Guangzhou.
On September 18, China Geo-engineering Corporation (CGC) signed a contract with Mozambique’s Water Supply Asset and Investment Fund (FIPAG) for the rehabilitation and expansion of the water supply system in Tofo tourism area of Inhambane Province.
On September 17, the 22nd China-ASEAN Expo and the China-ASEAN Business and Investment Summit opened in Nanning, Guangxi Zhuang Autonomous Region.
From September 8 to 11, at the 8th Central SOE QC Team Achievement Contest, CECEP Solar Energy Technology (Zhenjiang) Co.,
第  6  /  22  页  总条数: 110
Produced By CMS 网站群内容管理系统 publishdate:2025-11-28 10:28:40