On March 20, Liao Jiasheng, Chairman of CECEP, met with Xin Junfeng, Secretary of the Song County Party Committee of Luoyang, Henan Province, and his delegation at the CECEP headquarters.
On March 15, the project team of CQEC’s Chittagong Medical College project in Bangladesh, together with the affiliated hospital of the college, organized a free medical consultation event themed “Caring for the Frontline, Safeguarding Health”, delivering professional medical services and health support to frontline construction workers.
On March 13, CCTV-13 News 30’ reported that the 110-ton-class Liqing-2 pintle liquid oxygen–kerosene engine, independently developed by CAS Space, successfully completed a long-duration test run.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
第  36  /  54  页  总条数: 268
Produced By CMS 网站群内容管理系统 publishdate:2026-10-09 11:43:25